Sunday, 7 February 2010
Fitting a smaller sink in a secondary bathroom, Private House South London
Project:
The owners wanted more room in the secondary bathroom. They decided to remove the old sink and asked me to source and install a smaller more modern sink in keeping with the rest of the bathroom.
I matched the main bathroom fittings and sourced the same taps.
Duration:
3 Days including tiling and making good.
Interesting Point:
Whenever I work with plumbing I tend to re-visit the job a few weeks later to make sure everything is still perfect and the new tiles are settling in with the old tiles.
Some times I even age the new grouting to match the old grouting so that the new elements fit in well with the old elements.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment